P
Pratheek BS
Hi,
I have scheduled 2 tasks on the task scheduler, say A and B.
Need task A to run at 3:30 am and B to run at 6 am. How to provide the specifications.
Note- I am calling 2 different bat files using both the tasks.
Thanks!
Continue reading...
I have scheduled 2 tasks on the task scheduler, say A and B.
Need task A to run at 3:30 am and B to run at 6 am. How to provide the specifications.
Note- I am calling 2 different bat files using both the tasks.
Thanks!
Continue reading...