Scheduled Tasks no longer run since upgrading to Server 2012

V

Vallee18

Hello,


I recently upgraded from Server 2008 to Server 2012. I had tasks in the task scheduler which ran fine while on Server 2008, however, since the OS was upgraded to Server 2012 the scheduled tasks no longer run. What do I need to do to make them work again?


Some information:


  • The tasks have not been changed in any way since the upgrade to Server 2012
  • The tasks are set to run whether the user is logged on or not
  • The tasks are set to run with highest privileges
  • The user running the tasks is a part of the Backup Operators group. This has not changed
  • The user remains part of the “Log on as a batch job” group in Local Security Policy – Local Policies – User rights Assignment
  • The task “Configure for” setting on the General tab was changed as a test to Windows Server 2012 but this has no effect.


The tasks show as being completed successfully but nothing runs.

I tested by trying to run the schedules task in a command line : schtasks /run /s \\ServerName /TN “TaskName” but get an access denied.


Since upgrading to Server 2012 does something else need to change to get scheduled tasks to work again?

Thanks


r

Continue reading...
 
Back
Top Bottom