T
tnt
Guys,
We are looking to replace our Domain Controller which also have Terminal
Licenseing Server. Any methods/ways I can use to perform the procedure?
Here is my brief Domain Controller plan for a background of what I am doing.
I am not sure about the Terminal Licensing Server.
Thanks,
Tnt.
---------------------------------------------------------------------------
Guys,
I am looking to get ideas/opinions on the best approach to promote a 2003
(Enterprise) Server to a domain controller.
Right now, we have two domain controllers (ad1 & ad2) in our live
environment. Both are also dns servers (replication of each other). On ad1,
we have terminal licensing server as well.
We are looking to replace ad1 because we are having hardware issue (no
longer have raid1 and hardware is old).
I am looking for the safest and least downtime if possible. Not sure what
or how to move this licensing server since it factors into this equation.
I do want the new server having the same name "ad1". Could I bring the new
ad into production as "ad3_temp" and in a few days, bring the old ad1 down
and changing the name of the new AD to "ad1"?
Thanks a lot.
Tnt.
We are looking to replace our Domain Controller which also have Terminal
Licenseing Server. Any methods/ways I can use to perform the procedure?
Here is my brief Domain Controller plan for a background of what I am doing.
I am not sure about the Terminal Licensing Server.
Thanks,
Tnt.
---------------------------------------------------------------------------
Guys,
I am looking to get ideas/opinions on the best approach to promote a 2003
(Enterprise) Server to a domain controller.
Right now, we have two domain controllers (ad1 & ad2) in our live
environment. Both are also dns servers (replication of each other). On ad1,
we have terminal licensing server as well.
We are looking to replace ad1 because we are having hardware issue (no
longer have raid1 and hardware is old).
I am looking for the safest and least downtime if possible. Not sure what
or how to move this licensing server since it factors into this equation.
I do want the new server having the same name "ad1". Could I bring the new
ad into production as "ad3_temp" and in a few days, bring the old ad1 down
and changing the name of the new AD to "ad1"?
Thanks a lot.
Tnt.